Total Pre-Action Valve Data Center Solution with Strict Inspection Standards

Data center companies in Jabodetabek require precise and reliable fire protection systems. The Pre Action Valve plays a critical role in protecting sensitive IT infrastructure. ODG Nusantara Jaya successfully completed

Data center companies in Jabodetabek require precise and reliable fire protection systems. The Pre Action Valve plays a critical role in protecting sensitive IT infrastructure.

ODG Nusantara Jaya successfully completed Pre Action Valve services with strict inspection and testing procedures. The technical team ensured optimal performance across all system components.

Pressure Gauge and Control Valve Inspection

Technicians inspected pressure gauges on all control valves. They verified stable and accurate water supply pressure. All control valves were examined for wear, leaks, and physical damage. The team confirmed smooth mechanical operation.

Alarm and Supervisory Device Testing

The team tested tamper switches, flow switches, and air pressure switches. These tests ensured real-time detection capability. Valve supervisory alarm devices and mechanical devices were checked thoroughly. All alarms were verified to connect properly to the fire alarm panel.

Visual Inspection and Low Air Pressure Alarm Testing

Technicians visually inspected sprinklers, pipes, and fittings. They identified potential leaks and corrosion risks. Low air pressure alarms were tested on all pre-action valves. The alarm must activate before pressure drops below safe limits.

Simulation and Functional Testing

The team simulated pre-action valves by tripping the valve at the fire riser. This simulation verified accurate emergency response. Electrical tests were conducted without tripping the fire riser. These tests confirmed system integration. Each pre-action valve in the fire riser underwent full functional testing. Water flow performance met system design requirements.

Zone Isolation and Deluge Valve Trip Test

Technicians isolated system zones during testing. They also isolated relay modules to prevent unwanted activation. Each deluge valve completed a trip test. All results were documented in official maintenance reports. Through the Pre Action Valve project, ODG Nusantara Jaya ensured reliable fire protection readiness. Routine maintenance strengthens operational resilience and reduces downtime risk.